Project overview
Microsoft — Espoo / Kirkkonummi is a under construction AI or hyperscale datacenter project associated with Microsoft in Uusimaa, Finland. Public sources describe up to 300 MW of planned capacity. Reported completion timing is 2027.
Location and surrounding area
Microsoft — Espoo / Kirkkonummi is mapped at 60.1190, 24.4400 near Uusimaa, Finland. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Kirkkonummi, 01 (FI) (0.5 km)
- Grid infrastructure
- Plant, 1.1 km away; 13 mapped within 25 km
- Surface water
- Jolkbyån, 0.4 km away; 143 mapped within 25 km
- Power generation
- Solar plant, 1.1 km away; 8 mapped within 25 km