Datacenter Plot

Datacenter research record

Nvidia — Israel-1 (Yokneam)

Nvidia — Israel-1 (Yokneam) is a operational AI or hyperscale datacenter associated with Nvidia in Northern District, Israel. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Operational
Operator
Nvidia
Planned capacity
250 MW
Region
Northern District
Country
Israel

Project overview

Nvidia — Israel-1 (Yokneam) is a operational AI or hyperscale datacenter project associated with Nvidia in Northern District, Israel. Public sources describe up to 250 MW of planned capacity.

Location and surrounding area

Nvidia — Israel-1 (Yokneam) is mapped at 32.6600, 35.1100 near Northern District, Israel. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Yoqne‘am ‘Illit, 03 (IL) (2.2 km)

Grid infrastructure
תחנת חגית, 5.8 km away; 26 mapped within 25 km
Surface water
נחל קישון, 4.5 km away; 17 mapped within 25 km
Power generation
תחנת חגית, 5.8 km away; 25 mapped within 25 km