Datacenter Plot

Datacenter research record

SoftBank/Nvidia — Sakai, Japan

SoftBank/Nvidia — Sakai, Japan is a under construction AI or hyperscale datacenter associated with SoftBank / Nvidia in Osaka, Japan. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Under Construction
Operator
SoftBank / Nvidia
Planned capacity
300 MW
Expected completion
2026
Region
Osaka

Project overview

SoftBank/Nvidia — Sakai, Japan is a under construction AI or hyperscale datacenter project associated with SoftBank / Nvidia in Osaka, Japan. Public sources describe up to 300 MW of planned capacity. Reported completion timing is 2026.

Location and surrounding area

SoftBank/Nvidia — Sakai, Japan is mapped at 34.5733, 135.4830 near Osaka, Japan. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Sakai, 32 (JP) (1.8 km)

Grid infrastructure
堺港火力発電所, 2.8 km away; 72 mapped within 25 km
Surface water
内川, 0 km away; 439 mapped within 25 km
Power generation
堺港火力発電所, 2.8 km away; 66 mapped within 25 km