Anthropic / Fluidstack — Texas

Anthropic / Fluidstack — Texas is a planned AI or hyperscale datacenter associated with Anthropic / Fluidstack in Texas, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Planned
Operator
Anthropic / Fluidstack
Planned capacity
1000 MW
Expected completion
2026
Region
Texas

Project overview

Anthropic / Fluidstack — Texas is a planned AI or hyperscale datacenter project associated with Anthropic / Fluidstack in Texas, United States. Public sources describe up to 1,000 MW of planned capacity. Reported completion timing is 2026.

Location and surrounding area

Anthropic / Fluidstack — Texas is mapped at 31.0000, -100.0000 near Texas, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Brady, Texas (65.1 km)

Grid infrastructure
Heart of Texas Wind, 14.1 km away; 2 mapped within 25 km
Surface water
Brady Creek, 0.3 km away; 29 mapped within 25 km
Power generation
Heart of Texas Wind, 14.1 km away; 2 mapped within 25 km