Project overview
Anthropic-linked $366m data center project filed for in Cedar Creek, Texas is a announced AI or hyperscale datacenter project in United States.
Location and surrounding area
Anthropic-linked $366m data center project filed for in Cedar Creek, Texas is mapped at 32.7399, -96.8161 near United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Dallas, Texas (4.9 km)
- Grid infrastructure
- SMT Dallas BESS, 13.3 km away; 9 mapped within 25 km
- Surface water
- Turtle Creek, 1.9 km away; 88 mapped within 25 km
- Power generation
- SMT Dallas BESS, 13.3 km away; 6 mapped within 25 km