Applied Digital Polaris Forge 2

Applied Digital Polaris Forge 2 is a under construction AI or hyperscale datacenter associated with Applied Digital (Oracle anchor) in Harwood, ND (Cass Co), United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Under Construction
Operator
Applied Digital (Oracle anchor)
Planned capacity
280 MW
Expected completion
2027
Region
Harwood, ND (Cass Co)

Project overview

Applied Digital Polaris Forge 2 is a under construction AI or hyperscale datacenter project associated with Applied Digital (Oracle anchor) in Harwood, ND (Cass Co), United States. Public sources describe up to 280 MW of planned capacity. Reported completion timing is 2027.

Location and surrounding area

Applied Digital Polaris Forge 2 is mapped at 47.0233, -96.8580 near Harwood, ND (Cass Co), United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: West Fargo, North Dakota (16.8 km)

Grid infrastructure
Plant, 8.2 km away; 5 mapped within 25 km
Surface water
Sheyenne River, 0.6 km away; 15 mapped within 25 km
Power generation
Solar plant, 8.2 km away; 5 mapped within 25 km