Project overview
Applied Digital Polaris Forge 2 is a under construction AI or hyperscale datacenter project associated with Applied Digital (Oracle anchor) in Harwood, ND (Cass Co), United States. Public sources describe up to 280 MW of planned capacity. Reported completion timing is 2027.
Location and surrounding area
Applied Digital Polaris Forge 2 is mapped at 47.0233, -96.8580 near Harwood, ND (Cass Co), United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: West Fargo, North Dakota (16.8 km)
- Grid infrastructure
- Plant, 8.2 km away; 5 mapped within 25 km
- Surface water
- Sheyenne River, 0.6 km away; 15 mapped within 25 km
- Power generation
- Solar plant, 8.2 km away; 5 mapped within 25 km