CoreWeave Marble NC is a operational AI or hyperscale datacenter associated with CoreWeave in NC, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Operational
Operator
CoreWeave
Planned capacity
104 MW
Current power
65 MW
Region
NC

Project overview

CoreWeave Marble NC is a operational AI or hyperscale datacenter project associated with CoreWeave in NC, United States. Public sources describe up to 104 MW of planned capacity.

Location and surrounding area

CoreWeave Marble NC is mapped at 35.1850, -83.9141 near NC, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Tellico Village, Tennessee (63.4 km)

Grid infrastructure
Vonore Battery Energy Storage System, 7.7 km away; 8 mapped within 25 km
Surface water
Little Tennessee River, 0.9 km away; 11 mapped within 25 km
Power generation
Vonore Battery Energy Storage System, 7.7 km away; 8 mapped within 25 km