Project overview
Google — Mesa, AZ is a under construction AI or hyperscale datacenter project associated with Google in Arizona, United States. Public sources describe up to 350 MW of planned capacity. Reported completion timing is 2030.
Location and surrounding area
Google — Mesa, AZ is mapped at 33.4152, -111.8315 near Arizona, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Mesa, Arizona (1.1 km)
- Grid infrastructure
- Plant, 2.1 km away; 24 mapped within 25 km
- Surface water
- Gilbert Estates Phase Two Water Retention Basin, 3.8 km away; 45 mapped within 25 km
- Power generation
- Solar plant, 2.1 km away; 23 mapped within 25 km