Project overview
Meta — El Paso, TX is a under construction AI or hyperscale datacenter project associated with Meta in Texas, United States. Public sources describe up to 1,000 MW of planned capacity. Reported completion timing is 2028.
Location and surrounding area
Meta — El Paso, TX is mapped at 31.7619, -106.4850 near Texas, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: El Paso, Texas (0.4 km)
- Grid infrastructure
- Plant, 1.6 km away; 19 mapped within 25 km
- Surface water
- River street reservoir, 1.4 km away; 14 mapped within 25 km
- Power generation
- Rio Grande Power Plant, 7.8 km away; 14 mapped within 25 km