Datacenter Plot

Datacenter research record

Meta — El Paso, TX

Meta — El Paso, TX is a under construction AI or hyperscale datacenter associated with Meta in Texas, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Under Construction
Operator
Meta
Planned capacity
1000 MW
Expected completion
2028
Region
Texas

Project overview

Meta — El Paso, TX is a under construction AI or hyperscale datacenter project associated with Meta in Texas, United States. Public sources describe up to 1,000 MW of planned capacity. Reported completion timing is 2028.

Location and surrounding area

Meta — El Paso, TX is mapped at 31.7619, -106.4850 near Texas, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: El Paso, Texas (0.4 km)

Grid infrastructure
Plant, 1.6 km away; 19 mapped within 25 km
Surface water
River street reservoir, 1.4 km away; 14 mapped within 25 km
Power generation
Rio Grande Power Plant, 7.8 km away; 14 mapped within 25 km