Datacenter Plot

Datacenter research record

Microsoft — Atlanta (Fairwater), GA

Microsoft — Atlanta (Fairwater), GA is a planned AI or hyperscale datacenter associated with Microsoft in Georgia, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Planned
Operator
Microsoft
Planned capacity
700 MW
Expected completion
2026
Region
Georgia

Project overview

Microsoft — Atlanta (Fairwater), GA is a planned AI or hyperscale datacenter project associated with Microsoft in Georgia, United States. Public sources describe up to 700 MW of planned capacity. Reported completion timing is 2026.

Location and surrounding area

Microsoft — Atlanta (Fairwater), GA is mapped at 33.7490, -84.3880 near Georgia, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Atlanta, Georgia (0 km)

Grid infrastructure
Atlanta Falcons Solar, 1.2 km away; 7 mapped within 25 km
Surface water
Lake Clara Meer, 4.2 km away; 73 mapped within 25 km
Power generation
Atlanta Falcons Solar, 1.2 km away; 7 mapped within 25 km