Project overview
Microsoft — Atlanta (Fairwater), GA is a planned AI or hyperscale datacenter project associated with Microsoft in Georgia, United States. Public sources describe up to 700 MW of planned capacity. Reported completion timing is 2026.
Location and surrounding area
Microsoft — Atlanta (Fairwater), GA is mapped at 33.7490, -84.3880 near Georgia, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Atlanta, Georgia (0 km)
- Grid infrastructure
- Atlanta Falcons Solar, 1.2 km away; 7 mapped within 25 km
- Surface water
- Lake Clara Meer, 4.2 km away; 73 mapped within 25 km
- Power generation
- Atlanta Falcons Solar, 1.2 km away; 7 mapped within 25 km