Project overview
Microsoft Douglas County is a under construction AI or hyperscale datacenter project associated with Microsoft in Douglasville, GA, United States. Reported completion timing is 2026.
Location and surrounding area
Microsoft Douglas County is mapped at 33.7007, -84.7621 near Douglasville, GA, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Douglasville, Georgia (5.8 km)
- Grid infrastructure
- Turnipseed Solar, 8.6 km away; 2 mapped within 25 km
- Surface water
- Crystal Lake, 1.6 km away; 57 mapped within 25 km
- Power generation
- Turnipseed Solar, 8.6 km away; 2 mapped within 25 km