Project overview
Microsoft Fairwater Atlanta is a operational AI or hyperscale datacenter project associated with Microsoft in GA, United States. Public sources describe up to 250 MW of planned capacity.
Location and surrounding area
Microsoft Fairwater Atlanta is mapped at 33.4455, -84.5241 near GA, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Fayetteville, Georgia (6.4 km)
- Grid infrastructure
- MAS ASB Cogen Plant, 23.6 km away; 1 mapped within 25 km
- Surface water
- Walker Lake, 1.9 km away; 63 mapped within 25 km
- Power generation
- MAS ASB Cogen Plant, 23.6 km away; 1 mapped within 25 km