Project overview
Microsoft Project Fairwater (Mount Pleasant, Wisconsin) is a under construction AI or hyperscale datacenter project associated with Microsoft; NVIDIA in Mount Pleasant, WI, United States. Public sources describe up to 3,300 MW of planned capacity.
Location and surrounding area
Microsoft Project Fairwater (Mount Pleasant, Wisconsin) is mapped at 42.7230, -87.8720 near Mount Pleasant, WI, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Mount Pleasant, Wisconsin (3.1 km)
- Grid infrastructure
- Waxdale Wind, 3.1 km away; 14 mapped within 25 km
- Surface water
- Pike River, 2.2 km away; 19 mapped within 25 km
- Power generation
- Waxdale Wind, 3.1 km away; 13 mapped within 25 km