Datacenter Plot

Datacenter research record

Microsoft SAT 80

Microsoft SAT 80 is a operational AI or hyperscale datacenter associated with Microsoft in TX, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Operational
Operator
Microsoft
Region
TX
Country
United States

Project overview

Microsoft SAT 80 is a operational AI or hyperscale datacenter project associated with Microsoft in TX, United States.

Location and surrounding area

Microsoft SAT 80 is mapped at 29.4292, -98.8767 near TX, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Lakehills, Texas (20.5 km)

Grid infrastructure
Medina Lake BESS, 1.3 km away; 5 mapped within 25 km
Surface water
Medina Lake, 1.7 km away; 85 mapped within 25 km
Power generation
Medina Lake BESS, 1.3 km away; 5 mapped within 25 km