Project overview
Microsoft SYD05 Data Centre is a stale AI or hyperscale datacenter project associated with Microsoft in Australia. Reported completion timing is 2026.
Location and surrounding area
Microsoft SYD05 Data Centre is mapped at -33.8361, 150.7729 near Australia. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: Erskine Park, 02 (AU) (3.4 km)
- Grid infrastructure
- Wallgrove Battery, 3.1 km away; 8 mapped within 25 km
- Surface water
- Werrington Lake, 8.6 km away; 32 mapped within 25 km
- Power generation
- Wallgrove Battery, 3.1 km away; 6 mapped within 25 km