Datacenter Plot

Datacenter research record

NAO 1/NAO 2

NAO 1/NAO 2 is a operational AI or hyperscale datacenter associated with Meta in United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Operational
Operator
Meta
Expected completion
2026
Country
United States
Energy
Natural gas

Project overview

NAO 1/NAO 2 is a operational AI or hyperscale datacenter project associated with Meta in United States. Reported completion timing is 2026.

Location and surrounding area

NAO 1/NAO 2 is mapped at 40.0684, -82.7503 near United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: New Albany, Ohio (5.2 km)

Grid infrastructure
Amgen Solar Field, 4.1 km away; 10 mapped within 25 km
Surface water
Blacklick Creek, 3.5 km away; 29 mapped within 25 km
Power generation
Amgen Solar Field, 4.1 km away; 10 mapped within 25 km