Stargate — Abilene, TX is a operational AI or hyperscale datacenter associated with Oracle in TX, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Operational
Operator
Oracle
Planned capacity
1200 MW
Current power
421 MW
Expected completion
2026

Project overview

Stargate — Abilene, TX is a operational AI or hyperscale datacenter project associated with Oracle in TX, United States. Public sources describe up to 1,200 MW of planned capacity. Reported completion timing is 2026.

Location and surrounding area

Stargate — Abilene, TX is mapped at 32.4487, -99.7331 near TX, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Abilene, Texas (0 km)

Grid infrastructure
Lone Star Post Oak Wind, 23 km away; 3 mapped within 25 km
Surface water
Diamond Lake, 1.8 km away; 23 mapped within 25 km
Power generation
Lone Star Post Oak Wind, 23 km away; 3 mapped within 25 km