Switch Citadel — Tahoe Reno, NV

Switch Citadel — Tahoe Reno, NV is a under construction AI or hyperscale datacenter associated with Switch in Nevada, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Under Construction
Operator
Switch
Planned capacity
650 MW
Region
Nevada
Country
United States

Project overview

Switch Citadel — Tahoe Reno, NV is a under construction AI or hyperscale datacenter project associated with Switch in Nevada, United States. Public sources describe up to 650 MW of planned capacity.

Location and surrounding area

Switch Citadel — Tahoe Reno, NV is mapped at 39.5349, -119.4324 near Nevada, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Fernley, Nevada (17.5 km)

Grid infrastructure
Plant, 0.4 km away; 11 mapped within 25 km
Surface water
Truckee River, 20.1 km away; 4 mapped within 25 km
Power generation
Solar plant, 0.4 km away; 11 mapped within 25 km