Switch Las Vegas 4

Switch Las Vegas 4 is a operational AI or hyperscale datacenter associated with Switch in NV, United States. Review capacity, project timeline, nearby infrastructure, environmental context, and cited sources.

Status
Operational
Operator
Switch
Planned capacity
495 MW
Region
NV
Country
United States

Project overview

Switch Las Vegas 4 is a operational AI or hyperscale datacenter project associated with Switch in NV, United States. Public sources describe up to 495 MW of planned capacity.

Location and surrounding area

Switch Las Vegas 4 is mapped at 36.1436, -115.0768 near NV, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.

Area and infrastructure context

Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.

Nearest tracked place: Winchester, Nevada (4.1 km)

Grid infrastructure
Plant, 2.9 km away; 41 mapped within 25 km
Surface water
Twin Lakes, 8.2 km away; 12 mapped within 25 km
Power generation
Solar plant, 2.9 km away; 41 mapped within 25 km