Project overview
Vantage Building 3 is a stale AI or hyperscale datacenter project associated with Vantage in Ohio, United States. Public sources describe up to 64 MW of planned capacity. Reported completion timing is 2028.
Location and surrounding area
Vantage Building 3 is mapped at 40.0988, -82.7472 near Ohio, United States. Nearby infrastructure and environmental features are presented separately as geographic context. Proximity does not establish facility use, dependency, or impact.
Area and infrastructure context
Nearby features provide geographic context. Proximity alone does not show that this facility uses, affects, or depends on a resource.
Nearest tracked place: New Albany, Ohio (5.6 km)
- Grid infrastructure
- Amgen Solar Field, 4.1 km away; 10 mapped within 25 km
- Surface water
- Blacklick Creek, 3.5 km away; 29 mapped within 25 km
- Power generation
- Amgen Solar Field, 4.1 km away; 10 mapped within 25 km